News

Company
- De Stilte
- Staff
- Dancers

Point of view

Performances 09-10
- MADCAP
- ALICE
- Developing line

Performances 10-11
- MADCAP
- ALICE
- Duets

De Stilte home and abroad

Audition for a contract

Trainee audition

Tour

Reviews
- MADCAP
- ALICE

Education
- MADCAP
- ALICE

Technique
- MADCAP
- ALICE

Our theatre

Bookings
- Booking USA
- Bookings Holland
- Bookings Belgium
- Bookings Germany
- Bookings international

Guestbook
- Read
- Write

Contact

Technical rider MADCAP

Contact Sjoerd Hendrix - Sjoerd@destilte.nl for the light design


 
MADCAP

ARRIVAL                                                                 5,5 hours in advance of the performance

BUILDING                                                                 4 hours

BREAKING                                                               1 hour

AUDITORIUM OPEN                                                 30 min. before start performance

DURATION                                                              60 minutes

FLOOR                                                                    sprung floor

AREA                                                                      at least 29 x 29 feet - minimum 14 feet high (9 x 9 metres)

MATERIAl FLOOR                                                   black vinyl (dance floor)

TEMPERATURE AUDITORIUM                                 20 degrees C

TECHNICIANS COMPANY                                       1 technician

                                                                               1 tourmanager

TECHNICIANS THEATRE                                         2 technicians

 

The visiting company exists of five dancers, one educational employee, one technician and one tourmanager. We need at least one dressing-room and we would like to use a room where the dancers can have a warming-up about 2 hours before the performance. 

Technical

We will use the light- and sound equipment of the theatre. For light we will bring our own DMX compatible lightboard. The light is provided by the theatre, we will need 1 ETC junior or a comparable light which will hold a M-size gobo. For sound we need the normal FOH, monitoring on the floor and 1 MiniDisc-player with autopause. At the leftside and in back in the middle of the stage we will need a fixed voltage connection.

The ballet floor of the theatre will be laid in the length and the sides will be joined together very closely. The floor must stay loose from the underground. The sides will be left open partially because we will blow air under the floor which should be able to escape at the sides.

We will use two suspension points. One at the left side of the stage at about 12 feet from the backcloth, and the other in the middle of the stage at about 15 feet from the backcloth.  On both sides of the stage we will use legs (± 7 feet) at about 13 feet from the backcloth. There will be no smoke or fire during the performance. All the materials used are lighter than 25 kg or have wheels.

We don't use fire or smoke effects or any other dangerous effects. For unloading, building, breaking down and loading we need 2 technicians (one light and 1 sound/video) of the theatre in assistance of our technician.

Hospitality

We need the following hotel rooms:

3 single rooms

2 double rooms with seperate beds

For lunch please provide one or more of the following: brown sandwiches (also vegetarian), salad, fresh fruit, soup, yoghurt with muesli for 7 persons and if the performance starts at 16:00 or later a warm meal after breaking down. We have 2 vegetarians in the group, so please prepare at least sandwiches and/or warm meal for 2 persons without meat and fish.

Contact

For questions and remarks please contact +31765138125 and ask for  Sjoerd Hendrix or phone +31611623291 or sjoerd@destilte.nl.
Please call or mail if some light/sound materials are unavailable or if the space doesn't match the required measurements